The project covers the dismantling of the existing rainwater sewage and the design of a new vacuum rainwater sewage for the existing production hall and the implementation of stage 1 of the prepared project.
We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.
Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT