FOLLOW US:

Technical design, delivery, montage works and putting in operation of the WWTP Trigrad

Client:

Municipality of Devin

Scope of Work:

Technical design, supply and installation of technological equipment and commissioning of WWTP Trigrad

Capacity:

1 200 PE

Overview:

The technological design includes:

  • Preliminary treatment – primary sedimentation tank, which also works as a sludge storage tank; wastewater storage tank;
  • Biological treatment – two stages of submerged aerated biofilters with fixed biomass and sedimentation in secondary clarifier, using activated sludge processes to provide low – cost and stable purification of the wastewater;
  • Disinfection with NaOCl in case of epidemic;
  • Sludge transportation to a regional waste disposal site or for agricultural use.
WWTP
Location
Siteplan

Contacts

Contact us

GDPR*

For the company

We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.

Gallery

Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT