Technical design, delivery, montage works and putting in operation of the WWTP Trigrad
Client:
Municipality of Devin
Scope of Work:
Technical design, supply and installation of technological equipment and commissioning of WWTP Trigrad
Capacity:
1 200 PE
Overview:
The technological design includes:
Preliminary treatment – primary sedimentation tank, which also works as a sludge storage tank; wastewater storage tank;
Biological treatment – two stages of submerged aerated biofilters with fixed biomass and sedimentation in secondary clarifier, using activated sludge processes to provide low – cost and stable purification of the wastewater;
Disinfection with NaOCl in case of epidemic;
Sludge transportation to a regional waste disposal site or for agricultural use.