FOLLOW US:

Reconstruction of the WWTP Nova Zagora

Client:

Water supply and sewerage Sliven Ltd.

Scope of Work:

Preliminary and technical design for reconstruction of WWTP Nova Zagora

Capacity:

24 590 PE

Overview:

Within the scope of the project are:

  • Mechanical treatment – new coarse and fine screens, aerated grit and grease removal including blowers. New equipment for raw wastewater pump station and replacement of flowmeters;
  • Biological treatment – new simultaneous nitrification and denitrification biobasin with biological and chemical phosphorus removing, new blowers and equipment for secondary radial settling tanks;
  • Sludge treatment – reconstruction of the existing biobasin into aerobic stabilization tank, construction of new sludge silo and new dewatering building equipped with screw pumps, sludge dewatering centrifuge and polymer dosing installation.
WWTP Nova Zagora
Nova Zagora
Siteplan

Contacts

Contact us

GDPR*

For the company

We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.

Gallery

Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT

WATER ENVIRO PROJECT Ltd.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.