FOLLOW US:

Preliminary and Detailed design of WWTP Yambol and reconstruction of main collector IX- city of Yambol

Client:

Municipality of Yambol

Scope of Work:

Preliminary and Detailed design of WWTP

Capacity:

110 417 PE

Overview:

The reconstruction includes:

  • Preliminary treatment–fine screening, aerated grit and grease removal plant and primary sedimentation tank;
  • Biological treatment stage – phosphorus reduction (both biological and chemical), de- and nitrification in anaerobic selector, aerated bioreactor and secondary clarifier, using approved activated sludge processes to provide optimal and easily operated sanitation of the wastewater;
  • Disinfection with NaOCl, used in cases of epidemic;
  • Sludge treatment – anaerobic stabilization with biogas production and energy generation; mechanic-al dewatering and transportation to a waste disposal site.
WWTP Yambol
Siteplan
P&I Diagram

Contacts

Contact us

GDPR*

For the company

We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.

Gallery

Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT