FOLLOW US:

Preliminary and Detailed design of WWTP Yambol and reconstruction of main collector IX- city of Yambol

Client:

Municipality of Yambol

Scope of Work:

Preliminary and Detailed design of WWTP

Capacity:

110 417 PE

Overview:

The reconstruction includes:

  • Preliminary treatment–fine screening, aerated grit and grease removal plant and primary sedimentation tank;
  • Biological treatment stage – phosphorus reduction (both biological and chemical), de- and nitrification in anaerobic selector, aerated bioreactor and secondary clarifier, using approved activated sludge processes to provide optimal and easily operated sanitation of the wastewater;
  • Disinfection with NaOCl, used in cases of epidemic;
  • Sludge treatment – anaerobic stabilization with biogas production and energy generation; mechanic-al dewatering and transportation to a waste disposal site.
WWTP Yambol
Siteplan
P&I Diagram

Contacts

Contact us

GDPR*

For the company

We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.

Gallery

Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT

WATER ENVIRO PROJECT Ltd.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.