FOLLOW US:

Feasibility study for „Integrated water cycle of the teritory- construction of WWTP, reconstruction and extension of Water supply and sewage system“

Client:

Municipality of Sofia – Kremikovtsi region

Scope of Work:

Feasibility study for „Integrated water cycle of the territory- construction of WWTP, reconstruction and extension of Water supply and sewage system“

Capacity:

35 972 PE

Overview:

The prepared feasibility study includes Buhovo, Yana, Dolni Bogrov, Gorni Bogrov and districts Chelopechene, Botunets, Kremikovtsi, Seslavtsi and Vrazhdebna.

It includes:

  • Geographical location, administrative and territorial structure and engineering studies;
  • Alternative solutions and dimensioning of water supply and sewage network, appropriate for the local conditions, conclusions about the current state, a proposal for the construction stages, etc.;
  • Dimensioning parameters for the WWTP, options for recycling and disposal of sludge as well as options for collection and treatment of wastewater.
Map of Kremikovtsi area
Water supply network

Contacts

Contact us

GDPR*

For the company

We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.

Gallery

Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT

WATER ENVIRO PROJECT Ltd.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.