Feasibility study and detailed design for water supply, sewerage and WWTP for the Economic Zone

Client:

National company industrial zones

Scope of Work:

Feasibility study and detailed design for water supply, sewerage and WWTP for the Economic Zone

Capacity:

Q = 371,56 l/s

Overview:

Project includes:

  • Water supply pipeline, Equalization tank and fully automatized pressure increase system;
  • Site water supply and sewerage network;
  • Storm water equalization tank;
  • Fully automatized WWTP

Presented design solves the problem with water supply and discharging the storm water and wastewater from Economical zone Sofia.