FOLLOW US:

Detailed design for Reconstruction of WWTP Loznitsa and putting it into operation

Client:

Municipality of Loznitsa

Scope of Work:

Detailed design for Reconstruction of WWTP Loznitsa and commissioning

Capacity:

4 300 PE

Overview:

The reconstruction includes:

  • Preliminary treatment – additional aerated grease removal tank;
  • Biological treatment stage – nitrification, denitrification and phosphorus reduction in aerated bioreactor and secondary clarifier, using approved activated sludge processes to provide optimal and easily operated sanitation of the wastewater;
  • Disinfection with advanced UV technology, used in cases of epidemic.
  • Sludge treatment – aerobic stabilization, thickening and mechanical dewatering.
General view of the WWTP Loznitsa
FST and Pumping station for activated sludge
Sludge dewatering building

Contacts

Contact us

GDPR*

For the company

We build ecological infrastructure that improves the quality of life of the population and ensures the protection of ecosystems.

Gallery

Copyright © 2025 WEP LTD. All Rights Reserved. Created by ND SOFT

WATER ENVIRO PROJECT Ltd.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.