Within the scope of the project is the reconstruction of all structural, mechanical and electrical elements of the existing two sludge thickeners for surplus activated sludge, as well as the distribution shaft and the sludge shaft in WWTP – Kubratovo.
Based on the conclusions made on the current situation, the existing legislation and the hydraulic calculation for the thickeners, there is a number of construction and installation works provided in the project.